Construction steel bar butt welder safety operation proceduresAuthor:匿名 Source by: 本站原创 Published by: 2015年1月26日 Viewed by: 21547 [students] problem construction reinforced bar butt welding machine safety operation rules? [answer]
1 before operation, pressure mechanism of inspection of the welder should be flexible, fixture should be firm, liquid pressure system without leakage, confirm the correct before welding.
2 before welding, welding should be according to the reinforced section, two times to adjust the voltage, shall notexceed the prescribed diameter steel welding.
3 the machine shed to keep clean and tidy, drainage ditch. Should be timely maintenance welder, find fault shut down immediately report and timely repair.
4 welding spot in the range 10M, shall not be piled up all kinds of explosive articles.
5 flash area should set the baffle plate, welding irrelevant personnel are not allowed to enter.
6 after the operation, should clean up the site, cut off the power supply, removal of welding heat rear can lock gateto leave.
7 operating personnel must be documented appointment.
8 required to complete the daily inspection and maintenance records.
The above content according to students finishing encountered problems in practical work and become, for reference, if any problem, please timely communication. |